Mr. Githinji
Supervisor CHEMUSIAN RANCH LTD-IBISIL-KAJIADO COUNTY
Drilling of 300 metres borehole at the farm,supply and installation of a 20 h.p submersible water pump, civil works and construction of a 50m3 capacity steel pressed elevated water storage tank at the farm.
Engineer Mugwanja
Engineer IGIKIRO COMMUNITY WATER PROJECT -MURANG'A SOUTH MURANG'A COUNTY
Supplied and Insnstalled a TS3 Liaster diesel engine complete with a surface centrifugal pump on a common base
frame capable of a discharge yield of 30m3/hr at a head of 160 metres ,Construction of an undergound masonry water storage tank, UPVC Pipes, airlease valves and construction of a reinforced concrete pump house and an intake weir well at the banks of river Sabasaba
Mr. Muthee
Supervisor ECO -FARMS-IBISIL-KAJIADO COUNTY
Drilling of 260 metres borehole at the farm, supply and installation of 10 h.p submersible water pump and installations of drip irrigation system at the farm .
Mr. Fred
Head of Technical Department SOUTHERN "SUN" MAYFAIR HOTEL -NAIROBI COUNTY
Drilling of 300 metres borehole at the hotel's premises, supply and installation of 20 h.p submersible water pump, sundry mechanical accessories and the electrical control panel .
Mr. Dalip Singh
Supervisor ILLEDEMAT-ISINYA-KAJIADO COUNTY
Drilling of 250 metres borehole at the farm , supply and installation of 20 h.p solar powered submersible water pump, mechanical and installations of drip irrigation system at the farm .
Engineer Kamau
Engineer NGONG ZAMBIA ESTATE APARTMENTS-KAJIADO COUNTY
Drilling of 256 metres borehole at the premises ,supply and installation of a 15h.p solar powered submersible water pump, construction of 4Nos X 20m3 capacity steel pressed water storage tanks at the roof-top of the apartments.
Engineer Kamau
Engineer TASSIA ESTATE JENNEYS APARTMENTS-NAIROBI COUNTY
Drilling of 180 metres borehole at the premises ,supply and installation of a 10h.p submersible water pump ,construction of 20,000 litres capacity steel pressed elevated water storage tank at the site.
Mr. Enoch Okoth
Supervisor AMBOSELI TENTED -AMBOSELI-KAJIADO COUNTY
Extracting and fishing out a submersible water pump dislodged in the lodge borehole,cleaning the borehole,provision of steel well casings and supply of 10 h.p submersible water pump at the lodge .
Engineer Kamene
Engineer KASIKEU-KIBOKO-MAKINDU-MAKUENI COUNTY
Drilling of 230 metres borehole at the premises, supply and installation of a 10 h.p solar powered submersible water pump, construction of reinforced concrete water storage tank.
Rev. Macharia
Supervisor HOUSE OF PRAYER -ISINYA-KAJIADO COUNTY
Borehole rehabilitation at the church's premises, cleaning the borehole to 248 metres depth, supply and installation of 15h.p submersible water pump.
Mr. Cornelius Kihuha
Supervisor JANGA FARM LTD -KITENGELA-KAJIADO COUNTY
Drilling of 165 metres borehole at the farm, supply and installation of 7.5 h.p submersible water pump, installed 100KVA Cummins power electric generator set, mechanical, electrical accessories and overhead irrigation system at the farm.
Mr. Kinyua
Supervisor MR.WAKABA'S RESIDENCE-RIDGEWAYS -NAIROBI COUNTY
Construction of a kidney type swimming pool at the residence premises complete with the moonsoon shower pumps, filters, lights,eco-friendly calorinators and a whiripool complete with nozzles and hot spring spas jaccuzzis.
Engineer Mwangangi
Engineer THUAH ENTERPRISES LTD -THIKA-GATHARA-INI-EASTERN BYPASS- NAIROBI COUNTY
Drilling of 250 metres borehole at the premises ,supply and installation of 30h.p submersible water pump and construction of 108m3 capacity steel pressed elevated water storage tank on a 12 metres steel tower and auxiliary civil works.
Client
Supervisor KIUNE LTD -KAREN -NAIROBI COUNTY
Construction of 50m3 capacity steel pressed elevated water storage tank on 9 metres steel tower at his premises.
Mr. Muthee
Supervisor MUREITHI'S BOREHOLE -KAMUIRU-KIRINYAGA COUNTY
Drilling of 220 metres borehole at the premises ,supply and installation of 15 h.p submersible water pump and construction of 30m3 capacity steel pressed elevated water storage tanks on a 12 metres steel tower.
Mr. Watene
Group Farm manager GATAKA FARMERS COMPANY LTD -THIKA-KIAMBU COUNTY
Supplied and installed a surface centrifugal multistage water pump at the farm, irrigation pipes and farm systems covering over 300 acres, horticultural and green houses farming .
Mr. Reuben Ogot
Supervisor UNIVERSAL EMPORIUM LTD-MUMUI-NYANDARUA COUNTY
Borehole rehabilitation at Ndida farm-North Kinangop, Nyandarua county, cleaning of the borehole and test-pumping, repair and servicing of STI lister diesel engine and replacement of "ES15D" monolift bolehole pump at the farm.